Skip to content
Rene Lagos Engineers
  • Home
  • About Us
  • Services
    • Structural & Seismic Engineering
    • Value Engineering
    • Seismic Protection Systems (SPS)
    • Probable Maximum Loss (PML)
    • Structure Review
    • Performance Based Seismic Design (PBSD)
    • Retrofit of Structures
    • Vulnerability Analysis
    • BIM Consulting
  • Projects
    • Offices
    • Residential
    • Hotels
    • Retail
    • Hospitals
    • Gubernamentales
    • Educational
    • Industrialists
    • Houses
    • Special Structures
  • News
  • Contact
  • RLE BIM
  • en_USEnglish
    • es_CLEspañol
  • About Us
Menu Close
  • Home
  • About Us
  • Services
    • Structural & Seismic Engineering
    • Value Engineering
    • Seismic Protection Systems (SPS)
    • Probable Maximum Loss (PML)
    • Structure Review
    • Performance Based Seismic Design (PBSD)
    • Retrofit of Structures
    • Vulnerability Analysis
    • BIM Consulting
  • Projects
    • Offices
    • Residential
    • Hotels
    • Retail
    • Hospitals
    • Gubernamentales
    • Educational
    • Industrialists
    • Houses
    • Special Structures
  • News
  • Contact
  • RLE BIM
  • en_USEnglish
    • es_CLEspañol
  • About Us
  • Home
  • About Us
  • Services
    • Structural & Seismic Engineering
    • Value Engineering
    • Seismic Protection Systems (SPS)
    • Probable Maximum Loss (PML)
    • Structure Review
    • Performance Based Seismic Design (PBSD)
    • Retrofit of Structures
    • Vulnerability Analysis
    • BIM Consulting
  • Projects
    • Offices
    • Residential
    • Hotels
    • Retail
    • Hospitals
    • Gubernamentales
    • Educational
    • Industrialists
    • Houses
    • Special Structures
  • News
  • Contact
  • RLE BIM
  • en_USEnglish
    • es_CLEspañol
  • About Us
You are currently viewing Avance de la obra – 360 º del Hospital de Ñuble, Proyecto Hospitalario

Work progress - 360º of Hospital de Ñuble, Hospital Project

  • Post published:April 23, 2021
  • Post category:Ingeniería Estructural

We invite you to see in the following link, an advance of the work, in 360 º of the Hospital de Ñuble, Hospital Project that has Elastomeric Isolators, with an area of 130,000 m2 and is located in Chillán, Chile.


Post from RICOH THETA. #theta360 – Spherical Image – RICOH THETA

Fuente: https://aice.cl/web/milton-vicentelo-mejorar-la-comunicacion-en-las-decisiones-claves-de-diseno/

You Might Also Like

Read more about the article Luis de la Fuente: “Esta norma va a permitir estandarizar los alcances de los proyectos y regularizar sus cobros”

Luis de la Fuente: "This standard will make it possible to standardize the scope of projects and regularize their charges".

October 15, 2021
Read more about the article Arquitectos cuentan secretos de este edificio tipo colmena que tiene hasta bowling

Architects tell secrets of this beehive-like building that even has a bowling alley

December 14, 2023
Read more about the article Reconocida oficina de arquitectura extranjera junto a su socio nacional desarrollarán en Santiago cuatro edificaciones estructuradas en madera

Renowned foreign architectural firm and its national partner will develop four wood-structured buildings in Santiago

July 15, 2021
  • CTBUH Americas Steering Committee & Innovation Award CTBUH World Conference 2025
  • Gestión y Coordinación BIM Edificio La Castellana
  • “New or Renew” CTBUH 2024 World Conference in London
  • RLE Project published in CTBUH Journal
  • Architects tell secrets of this beehive-like building that even has a bowling alley
Copyright - OceanWP Theme by Nick